Wednesday, September 21, 2011

Log number 1

Since the start of this VEX Robotics project, I have written a design brief, background information, specifications, and limitations.  I have written both an individual and group verisons of the design brief, specifications, and limitations.  Today, I started and completed the event calendar and linked it to my blog.  I edited the graphics in each of my posts to enhance the overall appearance.